UPM-Kymmene, Changshu Project PM1, China
Fine paper mill, production 450 000 t/a
Building volume: 980 000 m3
Floor area: 85 000 m2
Project description:
Paper machine:
production 450 000 t/a
wire width 10 400 mm
construction speed 2 000 m/min
SC building 6 100 m2
intermediate storage 5 800 m2
sheeting plant 15 000 m2
paper storage building 14 000 m2
Power plant
Waste water treatment plant
Mill site engineering: road connections, underground structures, conveyor and pipe bridges
Stora Enso Oyj, Langerbrugge PM4, Belgium
Pöyry provided complete mill and structural engineering for the new 100 % recycled fibre-based newsprint line at Langerbrugge.
The investment included a new deinking plant, recovered paper storage, paper machine with finishing equipment, roll storage, solid fuel boiler and necessary connections to other mill departments, and expansion of the current water and waste water treatment plants.
The capacity of the plant is 400 000 tons of standard newsprint per year. The new paper machine came on stream on May 31, 2003. |